Overview of Journal Entries
- Benefits of Journal Entries
- Distinction from Tasks
- Structure and Classification of Journal Entries
- Efficient Entry of Journal Entries
- Journal Entries in the Mobile App
In order for journal entries to be used in the project, the journal must be enabled in the Project settings.
Benefits of Journal Entries
Journal entries are used to record construction site documentation. Observations, defects, and special events are documented directly at the location with photos and model sections, while the date of recording, location, and weather data are automatically added. This results in objective and traceable documentation. Photos and videos are also collected in the Media library, creating a centralized overview of the project’s progress. Since defects can be directly assigned to a responsible person with a due date, the documentation is seamlessly linked to the remediation process. In addition, journal entries can be created or added directly during the execution of Controls & Inspections, linking findings from site inspections immediately to the protocol. The log thus serves both as a working tool in day-to-day construction site operations and as supporting documentation for inspections, addenda, or disputes.
Construction site documentation, construction log, construction diary, defect documentation, on-site digital documentation, construction site photo documentation, automatic location and weather data, verification during inspections, preservation of evidence, log for controls and inspections, recording defects during inspection, exporting the log, tracking changes, what is the log used for
Distinction from Tasks
Journal entries and tasks complement each other but serve different purposes. Tasks are used to assign, plan, and coordinate work and assignments through comments. They typically arise during planning, coordination, or meetings. Journal entries, on the other hand, record what was observed or what happened on the construction site. They are usually recorded at the location, for example, during site inspections, controls, or inspections. Like tasks, journal entries can also be assigned to a responsible person with a due date and added to the agenda for meetings. The basic rule is: If something needs to be completed, a task is created. If something needs to be recorded, a journal entry is created. A defect serves as the interface between the two, as it is documented and simultaneously assigned for resolution. For more information on tasks, see the following article: Overview of Tasks & Topics.
Difference between a journal entry and a task; journal or task; when to use a journal entry and when to create a task; task vs. Journal; recording a defect as a task; assigning defects; adding a journal entry to the agenda for a meeting; documentation vs. Work order; recording vs. Completing
Structure and Classification of Journal Entries
A journal entry essentially consists of the classification, photos and videos, a description, and the assignment to a responsible person. Since an entry can be saved even if it is incomplete, observations are quickly recorded at the location and completed later. For more information, see the following article: Creating Journal Entries.

Classification can be used to specify the purpose of a journal entry. This allows entries to be specifically targeted Filtered and analyzed later.
Documentation
Classification documentation is used to objectively record a condition that does not require immediate action, such as construction progress, concealed structural elements prior to closing, or the preservation of evidence on adjacent properties.
defect
A defect refers to a deviation from the agreed-upon specifications that must be corrected, such as workmanship errors, damage, or missing components.
Incident
An incident records a specific event that affects the construction process or is relevant for future documentation, such as accidents, severe weather, delivery delays, or disruptions caused by third parties.
Classification of journal entries, documenting defects and incidents, differences between defects and incidents, What is an incident, defect reporting, documenting construction progress, documenting an accident, recording a delivery delay, journal entry fields, saving an incomplete journal entry, filtering journal entries by classification
Efficient Entry of Journal Entries
For recurring documentation, various tools are available that significantly reduce the effort required for data entry. With Journal Templates, frequently used details such as classification, categories, or the person responsible are predefined and automatically carried over when creating a new entry. In addition, selected content from the most recently created entry can be copied into a new journal entry, so that recurring information does not have to be re-entered. Using Voice Input, descriptions are dictated rather than typed. When adding Plan Sections to a journal entry, plans saved as Favorites are displayed directly for selection, eliminating the need to perform a search through the folder structure.
Journal templates, templates for journal entries, carry over content from the previous entry, voice input for the journal, dictate journal entries, select a plan section from favorites, quickly enter journal entries, recurring entries, reduce the effort required for data entry, quickly record defects
Journal Entries in the Mobile App
Since journal entries are primarily created on the construction site, the Mobile App offers additional roles for data entry at the location. Pinned log templates are immediately available for selection when creating a new entry and can be downloaded in advance, allowing entries to be recorded offline with just a few keystrokes. Photos and videos are captured using the built-in camera, which allows for multiple shots, direct image editing, and adding an additional description immediately after capture. To ensure documentation remains possible even with a poor internet connection, journal entries in pinned projects can be recorded offline and synchronized later. PDF plans saved as favorites and previously loaded models are also available offline, allowing users to create plan sections and pinpoint defects directly in the plan or model.
Journal Mobile App, record journal entries on your phone, create journal entries offline, offline use on construction sites, built-in camera, take multiple photos, transcribe voice memos, offline journal templates, offline plan sections, plans available offline, Locate defects in the model, pinned project, without an internet connection