Model exchange big
Basic information on model replacement
By integrating buildagil into big, the complete model, plan and document structure from buildagil is displayed directly in big so that the same, centrally stored data can be used at all times. This speeds up model exchange in BIM projects, simplifies access to current plans and models and reduces the risk of outdated information. At the same time, the entire BIM workflow is optimized because all participants can control the construction project in big without switching systems, while versioning, folder structure and permissions remain reliably managed in buildagil.
Setting up the model exchange
How the folder structure from buildagil is displayed in big is described in the following article: Digital document storage.
Updated on: 06/08/2025